Requirement: When Lord Williams's School - the
largest secondary school in Oxfordshire - enhanced its curriculum with a new
GNVQ course in Estates and Fisheries Management, it needed to provide specific
new teaching accommodation. The new building had to offer the right facilities
in the right location for students taking this very specialised course, which
includes many visits and outdoor activities.
Solution: The building
needed to be located in an area of the site with good road access, and needed to
include a large storeroom, plus a separate cloakroom where students could
remove wet clothes and boots before entering the classroom.
Site Manager,
John Smith, says: "We invited tenders from a number of building suppliers,
which were closely scrutinised by our senior managers and governors. Portakabin was chosen to provide the
building for a number of reasons.
"Firstly, the
build quality was outstanding, meeting all modern standards and exceeding
anything offered by the competition. Secondly, the fact that Portakabin was an approved building
supplier to the county's insurer, Zurich Municipal, was a very important
factor. The warranties supplied with Portakabin
buildings were also closely examined by our senior team, and were another key
point in the company's favour."
The Titan Building System from Portakabin provided precisely the facilities
the school was looking for and, in close consultation with the school, Portakabin adapted the building to meet
the specific requirements of the GNVQ course. It was supplied with whiteboards,
extra ICT positions, integrated blinds and additional electric sockets. The
building incorporated an entrance lobby with benches and coat hooks, a large,
lockable walk-in storage area and a bright, spacious main classroom.
The school was
assured of timely delivery of the building by the unique Portakabin Customer Charter, which promises that all buildings will
be delivered on time and on budget. Portakabin
even promises that if it ever fails to meet this commitment it will provide an additional
six months' product warranty, free of charge.* The building at Lord Williams's
School was delivered during the half-term break to minimise disruption to the
school, and was erected and fitted out in a matter of days.
John says:
"The service from Portakabin was
first class all the way. They were diligent and informative at all stages,
helping us with everything from the planning process to advising us on the
foundations. They provided reassurance every step of the way and no query was
too small.
"The vast
experience of the Portakabin people
really showed and was a real benefit to the project. They visited the site to
talk us through the full process, and everything was meticulously planned. Such
expert preparation meant that nothing was left to chance, and when the building
was delivered everything ran smoothly. The delivery and fit out ran to schedule
and all the work was completed efficiently and professionally. I didn't even
have to write a snagging list, because there simply weren't any snags.
"We have been very impressed by Portakabin, and everyone here is happy
with the new building. It provides exactly the accommodation we needed for our
new course."